top of page

Projects List

WALL COLLAPSE AT HYDRO POWER PLANT

Aaryan helped address the critical challenge of a wall collapse at a hydro power plant near Nashik, where a design defect led to a significant insurance claim of 1 crore rupees, highlighting the need for a thorough investigation into the root cause.

DEFECTS IN CEMENT PLANT DURING CONSTRUCTION

Aaryan tackled the challenge of cracks in a cement plant under construction in Sri Lanka, which caused an estimated USD 12 million in damage, by identifying gaps in the design review and drawing release processes and recommending corrective measures to ensure higher construction quality and long-term structural integrity.

CYCLONE DAMAGED JETTY

Aaryan helped resolve the challenge of a cyclone-damaged jetty in Vizag, which led to a 30 crore rupee insurance claim, by recommending against reconstruction and opting for a more cost-effective solution that saved time and resources while ensuring the jetty's continued functionality.

CYCLONE DAMAGED STEEL AND RCC WAREHOUSE

Aaryan addressed the challenge of a cyclone-damaged steel and RCC warehouse, with an insurance claim of 30 crore rupees, by recommending against reconstruction after thoroughly assessing the damage, including the impact of aging, and proposing a cost-effective solution that saved both time and resources.

PHARMACEUTICAL COMPANY ROOF

Aaryan helped resolve the challenge of multiple leakage spots on a pharmaceutical company's roof after the warranty period had expired by recommending a comprehensive revamp, which included a detailed audit, testing, and careful selection of a suitable roofing system, ensuring a long-term, cost-effective solution to prevent future leaks.

PHARMACEUTICAL INTERMEDIATES MANUFACTURING

Aaryan tackled the challenge of leakages affecting the storage of finished goods at a pharmaceutical intermediates manufacturing facility by revamping the washing area, implementing leak detection, quality monitoring, and compliance measures, resulting in improved storage conditions and enhanced facility efficiency.

INDIVIDUAL BUNGLOW OF A CORPORATE TITAN

Aaryan addressed the challenge of multiple leakages in an individual bungalow of a corporate titan by conducting a comprehensive waterproofing audit and leak detection, identifying the sources of the leaks and implementing both corrective and preventive measures to enhance the building's structural integrity and long-term durability.

HERITAGE STRUCTURE WITH RISING DAMPNESS

Aaryan helped resolve the persistent issue of rising dampness in an iconic heritage structure by conducting a thorough analysis and recommending a specialized treatment tailored for heritage buildings, effectively addressing the problem while preserving the structure’s historical value.

PREPARATION OF TECHNICAL DRAWINGS FOR A LEADING BRAND

Aaryan successfully developed detailed engineering drawings for a leading brand by following established guidelines and technical specifications, while also making necessary project-specific adaptations to ensure customization and precision for efficient project execution.

ROOT WITH MULTIPLE AHU AND OTHER EQUIPMENT

Aaryan addressed the challenge of waterproofing a roof with multiple Air Handling Units (AHUs) after the original warranty expired by conducting an audit and recommending a fast-curing waterproofing solution, ensuring minimal disruption and extended protection for the structure.

TESTING ON LARGE FIRE WATER RESERVOIR IN A PETROCHEMICAL PLANT FOR APPEARANCE OF LARGE SCALE CRACKS

Aaryan tackled the challenge of surface and deep cracks in a large reservoir in north India by analyzing temperature records, curing methods, and other testing data to identify the root cause and recommend an effective solution, ensuring the reservoir's structural integrity and long-term durability.

STRUCTURAL QUALITY ASSESSMENT FOR NEWLY CONSTRUCTED INDUSTRIAL PLANT IN SOUTH INDIA

Aaryan addressed the challenge of insufficient concrete strength at a newly constructed industrial plant in South India by correlating NDT and cube test results to identify the root causes, providing recommendations to restore the concrete's strength and ensuring the plant's structural integrity and long-term performance.

45 METER HIGH CHIMNEY ASSESSMENT IN CHATTISGARH

Aaryan addressed the challenge of assessing a 45-meter high chimney in Chhattisgarh following a collapse at a power plant by conducting detailed testing and certification, providing the client with assurance of the structure's stability and ensuring compliance with local regulations.

STRUCTURAL AUDIT FOLLOWED BY POST REPAIR TESTING FOR STRUCTURAL REPAIRS FOR FMCG MNC PLANT

Aaryans conducted a year-long structural audit and post-repair testing at a large FMCG MNC plant, covering both exterior and select interior areas. The project was meticulously planned to align with the client's business priorities, ensuring timely completion and stakeholder satisfaction.

TESTING AND ROOT CAUSE ANALYSIS ON 6 KM LONG CITY BYPASS FLYOVER FOR CRACKS IN PIERS

Aaryans conducted extensive testing on a 6 km city bypass flyover, identifying pier cracks' root causes and recommending effective remedial measures.

A LARGE CEMENT MANUFACTURING PLANT IN SOUTH INDIA.

Aaryans assessed a South India cement plant, identified concrete strength issues, and recommended restoration using NDT and cube test analysis.

STRUCTURAL AUDIT OR CEMENT PLANT IN NORTH INDIA COVERING MORE THAN 20 STRUCTURES

​Aaryans completed a structural audit of over 20 structures at a North India cement plant, enhancing operational efficiency and structural integrity.

STRUCTURAL AUDIT FOR STEEL MFG PLANT IN NORTH INDIA COVERING MORE THAN 30 STRUCTURES

Aaryans conducted a structural audit of over 30 structures at a North India steel plant, identifying defects and recommending safety improvements.

PREPARATION OF AS BUILT STRUCTURAL DRAWINGS FOR 500 ELEMENTS FOR MNC FMCG PLANT

Aaryans meticulously prepared as-built structural drawings for 500 elements at an MNC FMCG plant, overcoming site accessibility challenges and machinery constraints to facilitate effective retrofitting.​

GEAR BOX FOUNDATION ASSESSMENT IN SUDAN

Aaryans conducted a gearbox foundation audit in Sudan, identifying critical structural issues and recommending targeted reinforcement to enhance operational safety and longevity.

5000sq METER MARINE HERITAGE BUILDING STRUCTURAL AUDIT WITH REMEDIAL MEASURES

Aaryans audited a 5000 sq. meter marine heritage building, enabling safe restoration through detailed drawings, repairs, and cost-effective solutions.

40 METER HIGH MULTIPLE SILO AUDIT IN EAST INDIA

Aaryans conducted a detailed audit of 40-meter-high multiple silos in East India, identifying structural issues and providing actionable solutions to enhance safety, stability, and performance.

bottom of page