AARYAN "SAFE BUILDING" SYSTEM
STRUCTURAL, WATERPROOFING, FIRE, ELECTRICAL, LIFTS, TANKS, PLUMBING & STP
+91-9930264726
WATERPROOFING
Complete solution to leakages by waterproofing audits and PMC
Aaryan offers complete end-to-end consulting services, covering basement waterproofing, roof waterproofing, bathroom waterproofing, external wall waterproofing, using the latest waterproofing products and systems, evaluation of competent waterproofing contractors, supervision of works and ultimately a certification process. Waterproofing failures often lead to structural problems and vice versa. Aaryan provides a holistic approach to solve both together.
USING STATE OF THE ART EQUIPMENT
LOCATING THE SOURCE OF WATER LEAKAGE
Combining over 20 different instruments ranging from thermal cameras, moisture meters, locators, and acoustic instruments, our team has the expertise to locate the source of water leakage to a reasonable degree of accuracy.
CAPTURING REQUIREMENTS ACCURATELY
ESTABLISHING WATER PROOFING SYSTEM REQUIREMENT
Audit waterproofing to check current leaks, materials, warranty, measurement sheets, with on-site tests and analysis
EACH SYSTEM IN UNIQUE TO THE SITE
IDENTIFICATION OF IDEAL TECHNO COMMERCIAL SYSTEM SUITABLE FOR THE REQUIREMENT
Selection of the right waterproofing system to meet current and future requirements
MAPPING SYSTEM TO MANUFACTURER
SELECTION OF MANUFACTURER PROVIDING THE SELECTED SYSTEM
EM-PANELED APPLICATORS
EVALUATION OF AUTHORIZED APPLICATORS EXPERIENCED IN THE SYSTEM
Recommend the set of applicators experienced in executing system of the selected manufacturer
EXTENSIVE CHECKLIST
SUPERVISION OF EXECUTION WITH PERIODIC VISITS AT KEY MILESTONES
Periodic inspection by experts and engineers. Action points monitoring by back office for compliance
STATE OF THE ART INSTRUMENTS
PERIODIC TESTING OF WORKS AND MEASUREMENTS
Extensive periodic tests to measure and monitor the execution by applicator
along with the manufacturer
COMPLIANCE STATEMENT
CERTIFICATION OF SUCCESSFUL COMPLETION OF WORKS
Collect extensive site data, inspection reports, test reports for issuing water proofing certification.
DEFINED CHECKLIST FOR MONTHS, QUARTER AND YEAR
PREVENTIVE MAINTENANCE METHODS PROTOCOL
Periodic testing post application, twice a year to ascertain the effectiveness of system. Issues if any are promptly actioned.
PERIODIC CHECKS
PERIODIC EVALUATION OF WATERPROOFING SYSTEM
Periodic checking of weak spots especially pre monsoon to preempt and take preventive action well in time.