Lets learn about vision boards
THE SUCCESS FORMULA
THE SUCCESS FORMULA
SIMPLE 3 STEP PROCESS
SIMPLE 3 STEP PROCESS
TM
AARYAN "SAFE BUILDING" SYSTEM
STRUCTURAL, WATERPROOFING, LIFTS, TANKS, PLUMBING & STP
+91-9930264726
Sudden false ceiling collapses injure hundreds of people every month. Make sure you and your colleagues are not one of them!
Protect the lives of staff and visitors and
Ensure zero risk for management by assuring the integrity of false ceiling in your office despite ageing components and leakages that corrode the supports, without disrupting your work with
Aaryan False Ceiling Audit System, that offers a one-stop solution for inspection, non-destructive testing & periodic supervision and certification of building systems.
DO YOU HAVE ANY OF THESE FALSE CEILING SCENARIOS IN YOUR BUILDING?
Newly done false ceiling work in new construction.
Many false ceilings fail within 6 months of installation. Too much distance between supports, Non anchoring of supports, are common causes. Aaryan audits newly done false ceilings in offices to ensure compliance to best national and international standards.
False ceiling under the wet areas like washrooms
Leakages under the wet areas cause the false ceiling supports to corrode and cause a sudden collapse. In this area there is a continuous presence of water due to leakages. We have a separate leak detection system which can be deployed.
False ceiling at the periphery of your building.
External leakages from rains cause leakages that damage the supports due to corrosion. Over a period of time, thiss can lead to a sudden collapse serverly injuring someone below. Such Collapses are common during monsoons.
Renovation of office with false celing in old construction.
Lack of structural repairs prior to the fixing of false ceiling may lead to a chunk of slab concrete falling and falling down. This heavy chunk of concrete can break the false ceiling and come down.
Fitting of new fixtures like lights, ceiling air conditioners etc.
Often agencies who install these fitments, damage the false ceilign supports. Sometimes the load of the fittings comes on the existing supports, leading to the partial or total collapse.
Collapse of false ceiling at another location.
A false ceiling collapse in the building implies that the works done and the environment at other locations, being similar, there is a risk at other locations also. An urgent audit is mandatory.
Eliminate risk to the occupants NOW!
False ceiling collpases due to any reason can seriously hurt and injure, sometimes causing death of a person. As a responsible member management or advisors of the offices, take proactive steps now!
Eliminate legal & criminal risk to the management NOW!
The final responsibility of safety of occupants lies with the management and owners of the premises. Ensure that there is no risk of legal and criminal liabilities.
FOUNDED BY IIT EXPERTS
THE PIONEER IN TESTING BUILDINGS SINCE 1970s
The company is founded by Prof R G Limaye, Retd, Professor, IIT Bombay, who was the pioneer of non destructive testing in India and an expert in concrete technology. His values and principles continue to guide the company in offering its professional services.
SIMPLE 4 STEP PROCESS
FROM SITE SURVEY TO REMEDIAL MEASURES - A SIMPLE PROCESS
Aaryan has a thorough process to ensure zero risk.
SITE SURVEY
A detailed site survey is conducted to mark the areas, wet areas, take renovation history and plan for detailed inspection.
DETAILED INSPECTION
A deatiled inspection is carried out with testing like mositure meter, pull out tests, infra red camera tests.
ROOT CAUSE
Determination of current status and the root cause of issues and foreseen problems is tabulated.
REMEDIAL MEASURES
Remedial measures are specified to mitigate the future risks and resolve the current issues.
TRADITIONAL METHOD
INSPECTION BASED. NO TESTING. USUALLY A PAPER FORMALITY.
A visit by a supervisor is followed by a one-page report. The simple process could be misleading as it does not involve drawing validation, photographs, best practices, testing and a compliance report,
Validation of drawings
Non Destructive Testing
Detailed Report
Best practises
SUCCESS STORIES
BUILDINGS, OFFICES, SOCIETIES, APARTMENTS & MORE...
Hundreds of buildngs are assesed by Aaryan every year all over India.
10,000+ STRUCTURES ASSESSED IN 15 YEARS
TOP REASONS FOR CEILING AUDIT
SUITABLE FOR ALL Apartments, Societies, Commercial and Industrial Buildings.
ASSESSMENT OF CURRENT SYSTEMS
Structural drawings, waterproofing areas, affected areas etc are marked and assessed for the serverity of damage.
NON- DESTRUCTIVE TESTING
State-of-the-art instruments are used to identify supporting members, to ensure that the members have the capacity to carry the load and are anchored properly. The extent of corrosion if any, of the members is also noted.
REPORT WITH ROOT CAUSE AND REMEDIAL MEASURES.
Aaryan methodology for assessment is proven and detailed, complying to relevant standards. An exhaustive report follows, with root cause analysis and remedial measures.
PERIODIC INSPECTION DURING IMPLEMENTATION
Periodic supervision visits matching crucial milestones of the project ensures risk-free execution of false ceiling installations.
TESTING POST IMPLMENTATION
Ensure implementation is completed as per the original plan approved
COMPLIANCE CERTIFICATE
Compliance certificate Issued for the project post rectification, rectification and compliance
PROVEN PROCESS
AUTOMATION, STANDARDIZATION, MONITORING
Aaryan has low lead times to start assignments quickly with online project planned and execution.
Online System
- Online data capture
- SOP and process compliance
- Live project progress track
Personal Attention
- Dedicated account manager
- Visits by qualified Engineer
Report
- Test report
- Condition survey report
- Preventative maintenance steps
- Certificate from lic. Engineer
ADVANTAGES
ZERO RISK. ZERO HEADACHE.
Zero Risk:
Eliminate legal & criminal risk to the occuptants by Aaryan compliance report.
Zero Headache:
A false ceiling collapse demoralizes the team and takes their mind away from productive work. This is a headache to the management. Aaryan helps you eliminate the headache.
IN HOUSE NABL ACCREDITED LAB
EXTENSIVE RANGE OF CONCRETE AND WATERPROOFING TESTING EQUIPMENT
With over 30 types of tests done on concrete and waterproofing, you are sure of the condition pre and post execution of repairs.
Thermal Imaging
Ultrasonic Testing
A PLAN TO SUIT EVERY BUDGET
PLANS TO SUIT EVERY REQUIREMENT
We have all sizes covered in our plans. Partial or full false ceiling audits, new or old ceilings, supervision of works or only investigation, we have it all covered in our plans.
JOIN THE MISSION
TRUE PURPOSE OF LIFE IS MAKING THE WORLD SUSTAINABLE
MISSION ONE MILLION
Our mission is to enable one million people to live safely by auditing false ceilings and ensuring compliance with prevailing standards.
Join our ever-growing Aaryan family now!.