top of page
aaryans logo new.jpg

Sudden false ceiling collapses injure hundreds of people every month. Make sure you clients, their staff & colleagues are not one of them!

Protect the lives of staff and visitors and

Ensure zero risk for your clients' management team by assuring the integrity of false ceiling in their office despite ageing components and leakages that corrode the supports, without disrupting their work with

Aaryan False Ceiling Audit System, that offers a one-stop solution for inspection, non-destructive testing & periodic supervision and certification of building systems.

ed person (1).png
a-Collapsed-suspended-ceilings-and-b-gypsum-block-partitions-2.png
gyproc-plasterboard-false-ceiling.jpg
Streme logo (2)_edited.png

CUSTOMER TESTIMONIALS

WhatsApp Image 2024-11-06 at 12.06.01 PM.jpeg

Paresh Mestri

ADDIOX.png

We are getting very good support from the Aaryan team for NDT testing and conditioning health assessment of the structure of Tata Power.

1_edited_edited.jpg

Sunny Verma 

ADDIOX.png

Worked with Saurabh Borle on one of the projects. Quite impressed with Saurabh's depth of knowledge and insights. He's responsive, professional and ensures the matter is handled to customer's satisfaction.

2_edited.jpg

Nitin Sahani

ADDIOX.png

Thank you for your technical support for performing NDT tests for our various sites and helping us with test results. It is always a pleasure working with your team

FALSE CEILINGS COLLAPSE WITHOUT WARNING

ed person (2)_edited.jpg

AARYAN FALSE CEILING AUDIT MITIGATES THE RISK TO TOP MANAGEMENT

False Ceiling support check of load bearing capacity 

The type of support, the material used, its gauge, the fasteners, are all observed to create a  as built drawing of the false ceiling to check compliance against prevailing standards.

Leakage and Seepage Check by Infra red cameras

Wet spots, cold spots, presence of condensing humidity etc, are indicated by color differences observed in thermal images. This helps to focus the investigation to areas of specific concern.

Endoscopic inspection of false ceilings

By just removing a few light fixtures and panels, the false ceiling can be inspected easily. This endoscopic inspections are ideal to assess the condition of hard to reach places. 

DO YOU HAVE ANY OF THESE FALSE CEILING SCENARIOS IN YOUR BUILDING?

ed person (2)_edited.jpg
lady-holding-pail-to-collect-leaking-ceiling_edited.jpg
Why_do_the_windows_leak_when_it_rains.jpeg

NEWLY DONE FALSE CEILING WORK IN NEW CONSTRUCTION

FALSE CEILING UNDER THE WET AREAS LIKE WASHROOMS

FALSE CEILING AT THE PERIPHERY OF YOUR BUILDING

Many false ceilings fail within 6 months of installation. Too much distance between supports, Non anchoring of supports, are common causes. Aaryan audits newly done false ceilings in offices to ensure compliance to best national and international standards.

Leakages under the wet areas cause the false ceiling supports to corrode and cause a sudden collapse. In this area there is a continuous presence of water due to leakages. We have a separate leak detection system which can be deployed.

External leakages from rains cause leakages that damage the supports due to corrosion. Over a period of time, thiss can lead to a sudden collapse serverly injuring someone below. Such Collapses are common during monsoons.

1689053595768.jpg
ed person (3).png
06bhrAIIMS22big_edited.jpg

RENOVATION OF OFFICE WITH FALSE CEILING IN OLD CONSTRUCTION

FITTING OF NEW FIXTURES LIKE LIGHTS, CEILING AIR CONDITIONERS ETC

COLLAPSE OF FALSE CEILING AT ANOTHER LOCATION

Lack of structural repairs prior to the fixing of false ceiling may lead to a chunk of slab concrete falling and falling down. This heavy chunk of concrete can break the false ceiling and come down.

Often agencies who install these fitments, damage the false ceilign supports. Sometimes the load of the fittings comes on the existing supports, leading to the partial or total collapse.

A false ceiling collapse in the building implies that the works done and the environment at other locations, being similar, there is a risk at other locations also. An urgent audit is mandatory.

Eliminate risk to the occupants NOW!

False ceiling collpases due to any reason can seriously hurt and injure, sometimes causing death of a person. As a responsible member management or advisors of the offices, take proactive steps now!

Eliminate legal & criminal risk to the management NOW!

The final responsibility of safety of occupants lies with the management and owners of the premises. Ensure that there is no risk of legal and criminal liabilities.

CUSTOMER TESTIMONIALS

1_edited_edited.jpg

Sarita Patil

ADDIOX.png

We did testing (non destructive) from Aaryan. It was done properly and we are satisfied with their work

3_edited.jpg

Pankaj Patil

ADDIOX.png

We did testing (non destructive) from Aaryan. It was done properly and we are satisfied with their work

WhatsApp Image 2024-11-06 at 12.08.13 PM.jpeg

Er. Viket Ajit Ware

ADDIOX.png

Great teamwork and excellent services provided with an optimum timeline.

CEILING COLLPASES CAUSE SERIOUS INJUIRIES

Ceiling-collapse representative.jpg

THE PIONEER IN TESTING BUILDINGS SINCE 1970s

FOUNDED BY IIT EXPERTS

The company is founded by Prof R G Limaye, Retd, Professor, IIT Bombay, who was the pioneer of non destructive testing in India and an expert in concrete technology. His values and principles continue to guide the company in offering its professional services.

CUSTOMER TESTIMONIALS

7_edited.jpg

Mamta bhusara

ADDIOX.png

Aaryan team was experienced in nondestructive testing and prompt about their offerings and timely in terms of work completion.. Helped us to finish work on time.

3_edited.jpg

Priyanka Maurya

ADDIOX.png

Aaryan is a well-known firm for structural audits. With a well equipped NDT lab. Testing and structural audit experience was really good.

3_edited.jpg

Prateek Jaswant

ADDIOX.png

We had to do Structural Audits of our building as per government and municipal corporation rules. We got our job done from Aaryan Structcon Pvt Ltd and are very happy with the way they work. Very transparent, clear and fast. I recommend their services

FROM SITE SURVEY TO REMEDIAL MEASURES - A SIMPLE PROCESS

SIMPLE 4 STEP PROCESS 

Aaryan has a thorough process to ensure zero risk.

SITE SURVEY

A detailed site survey is conducted to mark the areas, wet areas, take renovation history and plan for detailed inspection.

DETAILED INSPECTION

A deatiled inspection is carried out with testing like mositure meter, pull out tests, infra red camera tests.

ROOT CAUSE

REMEDIAL MEASURES

Determination of current status and the root cause of issues and foreseen problems is tabulated.

Remedial measures are specified to mitigate the future risks and resolve the current issues.

TIMELY AND REGULAR FALSE CEILING AUDITS
MITIGATE THE RISK  OF CRIMINAL AND FINANCIAL LIABILITIES. 

SUCCESS STORIES

BUILDINGS, OFFICES, SOCIETIES, APARTMENTS & MORE...

Hundreds of buildngs are assesed by Aaryan every year all over India.

10,000+ STRUCTURES
ASSESSED IN
15 YEARS

TOP REASONS FOR CEILING AUDIT

SUITABLE FOR ALL Apartments, Societies, Commercial and Industrial Buildings

unnamed.jpg
unnamed (1).jpg
Untitled design_edited.jpg

ASSESSMENT OF CURRENT SYSTEMS

NON- DESTRUCTIVE TESTING

REPORT WITH ROOT CAUSE AND REMEDIAL MEASURES.

Structural drawings, waterproofing areas, affected areas etc are marked and assessed for the serverity of damage

State-of-the-art instruments are used to identify supporting members, to ensure that the members have the capacity to carry the load and are anchored properly. The extent of corrosion if any, of the members is also noted.

Aaryan methodology for assessment is proven and detailed, complying to relevant standards. An exhaustive report follows, with root cause analysis and remedial measures

unnamed (2)_edited.jpg
UPV.jpg
unnamed (3).png

PERIODIC INSPECTION DURING IMPLEMENTATION

TESTING POST IMPLMENTATION

COMPLIANCE CERTIFICATE

Periodic supervision visits matching crucial milestones of the project ensures risk-free execution of false ceiling installations.

Ensure implementation is completed as per the original plan approved

Compliance certificate Issued for the project post rectification, rectification and compliance

horizontal-mindfulness_edited.jpg

100%
peace of mind with
“Aaryan Safe Building System”

Streme logo (2)_edited.png

TAKE A QUICK 5 POINT SURVEY:

Are you facing any of these issues in your buildings?

Even if one of the above is ticked,
Aaryan False Ceiling Audit is mandatory in your building.

TAKE ACTION NOW!

Be proActive. Be Effective

PROVEN TECHNOLOGY

AUTOMATION, STANDARDIZATION, MONITORING

Aaryan has low lead times to start assignments quickly with online project planned and execution.

ONLINE SYSTEM

- Online data capture
- SOP and process compliance
- Live project progress track

PERSONAL ATTENTION

- Dedicated account manager
- Visits by qualified Engineer

REPORT

- Test report
- Condition survey report
- Preventative maintenance steps
- Certificate from lic. Engineer

ZERO RISK. ZERO HEADACHE..

ADVANTAGES

0

Risk

Eliminate legal & criminal risk to the occuptants by Aaryan compliance report.

0

A false ceiling collapse demoralizes the team and takes their mind away from productive work. This is a headache to the management. Aaryan helps you eliminate the headache.

Headache

  • How soon can you deploy the team at site?
    The Intial site visit is done in a few days. Thereafter, Our usual mobilization time is a week for site work, post confirmation of order.
  • How much time does it take to complete the rca assignment?
    Typical investigations take a few weeks to compete. The actual scope and time lines depends on many factors.
  • Do you also provide remedial scheme?
    We provide a review of the remedial scheme, provided by the engineers and contractors appointed by clients, which covers quantity and rates, so that they are reasonable and inline with good engineering practises.
  • What are the costs of doing a rca?
    The costs depend on the scope of investigation, including the area to be investigated. It is always better to conduct a site visit first to observe the nature of failure and available documentation and then decide the scope.
  • Do you offer this service, pan India?
    Our team works across India and can be mobilized at a short notice.
  • Do you also conduct audits for new construction also?
    We work across old and new construction, across types of structures like buildings, factories, flyovers, jetties, power plants etc. Having steel, masonary or RCC structures.

AUDIT TOOLKIT

A TYPICAL TOOLKIT INCLUDES THE FOLLOWING

  1.  Endoscope with flexible camera head

  2.  Thermal camera 

  3.  Laser distance meter

  4. Acoustic Light hammer tapping 

  5. Pullout tester for ceiling fasteners

  6. Torque tester for nut bolt fasteners.

SITE REQUIREMENTS

SAFE ACCESS TO THE SITE
WITH SCAFFOLDING

INSPECTION AREAS MARKED ON LAYOUT

HOUSE KEEPING  SUPPORT

Safe access to the site with approved scaffolding or ladders or scissor lifts is required to reach the  high and hard to  reach locations.

The area to be inspected to be marked on the layout drawing. This identifies the total false ceiling area, type of false ceiling and area considered for audit 

Removal of fixtures and panels, debris clearing if any, requires support from the  local housekeeping and maintenance teams. 

IN HOUSE R&D AND DEVELOPMENT SETUP

EXTENSIVE RANGE OF CONCRETE AND WATERPROOFING TESTING EQUIPMENT

With over 30 types of tests done on concrete and waterproofing, you are sure of the condition pre and post execution of repairs.

3.png

Thermal Imaging

4.png

Ultrasonic Testing

PLANS TO SUIT EVERY REQUIREMENT

A PLAN TO SUIT EVERY BUDGET

We have models to suit every budget and every size.
 

PROFESSIONAL

ENTERPRISE

 

ADVANCED

- Inspection and testing based on thermal imaging over a larger area. 

- Inspection on sampling basis with a few locations tested by removing panels 

- Extensive inspection and testing  based on thermal imaging and endoscopy.

JOIN THE MISSION

THE PURPOSE OF LIFE IS TO CREATE EXTRAORDINARY EXPERIENCE FOR A LIFETIME.

m (4)_edited.jpg

MISSION ONE MILLION

Our mission is to create a million safe and healthy living areas and workspaces for our global clients across industry segments by providing state of the art audit, testing, supervision and certification services.

Streme logo (2)_edited.png

Aaryan is a professional system for preventing structural and leakage issues. The information given is not intended to give any guarantee, make claims or prove the effectiveness of any system, as the solutions offered by Aaryan are specific to the site conditions at the time of inspection.

Aaryan intellectual property is protected internationally by patents, copyright, and trademarks as applicable. The usage is governed by privacy policy & terms and conditions. ©2023 Aaryan Structcon Pvt Ltd. Aaryan is a registered trademark.

bottom of page