Sudden false ceiling collapses injure hundreds of people every month. Make sure you and your colleagues are not one of them!
Protect the lives of staff and visitors and
Ensure zero risk for management by assuring the integrity of false ceiling in your office despite ageing components and leakages that corrode the supports, without disrupting your work with
Aaryan False Ceiling Audit System, that offers a one-stop solution for inspection, non-destructive testing & periodic supervision and certification of building systems.
.png)


CUSTOMER TESTIMONIALS

Paresh Mestri

​We are getting very good support from the Aaryan team for NDT testing and conditioning health assessment of the structure of Tata Power.

Sunny Verma

Worked with Saurabh Borle on one of the projects. Quite impressed with Saurabh's depth of knowledge and insights. He's responsive, professional and ensures the matter is handled to customer's satisfaction.

Nitin Sahani

Thank you for your technical support for performing NDT tests for our various sites and helping us with test results. It is always a pleasure working with your team
FALSE CEILINGS COLLAPSE WITHOUT WARNING
_edited.jpg)
AARYAN FALSE CEILING AUDIT MITIGATES THE RISK TO TOP MANAGEMENT
False Ceiling support check of load bearing capacity
The type of support, the material used, its gauge, the fasteners, are all observed to create a as built drawing of the false ceiling to check compliance against prevailing standards.
Leakage and Seepage Check by Infra red cameras
Wet spots, cold spots, presence of condensing humidity etc, are indicated by color differences observed in thermal images. This helps to focus the investigation to areas of specific concern.
Endoscopic inspection of false ceilings
By just removing a few light fixtures and panels, the false ceiling can be inspected easily. This endoscopic inspections are ideal to assess the condition of hard to reach places.
DO YOU HAVE ANY OF THESE FALSE CEILING SCENARIOS IN YOUR BUILDING?
_edited.jpg)


NEWLY DONE FALSE CEILING WORK IN NEW CONSTRUCTION
​FALSE CEILING UNDER THE WET AREAS LIKE WASHROOMS
​FALSE CEILING AT THE PERIPHERY OF YOUR BUILDING
Many false ceilings fail within 6 months of installation. Too much distance between supports, Non anchoring of supports, are common causes. Aaryan audits newly done false ceilings in offices to ensure compliance to best national and international standards.
Leakages under the wet areas cause the false ceiling supports to corrode and cause a sudden collapse. In this area there is a continuous presence of water due to leakages. We have a separate leak detection system which can be deployed.
External leakages from rains cause leakages that damage the supports due to corrosion. Over a period of time, thiss can lead to a sudden collapse serverly injuring someone below. Such Collapses are common during monsoons.

.png)

​RENOVATION OF OFFICE WITH FALSE CEILING IN OLD CONSTRUCTION
FITTING OF NEW FIXTURES LIKE LIGHTS, CEILING AIR CONDITIONERS ETC
COLLAPSE OF FALSE CEILING AT ANOTHER LOCATION
Lack of structural repairs prior to the fixing of false ceiling may lead to a chunk of slab concrete falling and falling down. This heavy chunk of concrete can break the false ceiling and come down.
Often agencies who install these fitments, damage the false ceilign supports. Sometimes the load of the fittings comes on the existing supports, leading to the partial or total collapse.
​A false ceiling collapse in the building implies that the works done and the environment at other locations, being similar, there is a risk at other locations also. An urgent audit is mandatory.
Eliminate risk to the occupants NOW!
False ceiling collpases due to any reason can seriously hurt and injure, sometimes causing death of a person. As a responsible member management or advisors of the offices, take proactive steps now!
Eliminate legal & criminal risk to the management NOW!
The final responsibility of safety of occupants lies with the management and owners of the premises. Ensure that there is no risk of legal and criminal liabilities.
CUSTOMER TESTIMONIALS

Sarita Patil

​We did testing (non destructive) from Aaryan. It was done properly and we are satisfied with their work

Pankaj Patil

We did testing (non destructive) from Aaryan. It was done properly and we are satisfied with their work

Er. Viket Ajit Ware

​Great teamwork and excellent services provided with an optimum timeline.
CEILING COLLPASES CAUSE SERIOUS INJUIRIES

​THE PIONEER IN TESTING BUILDINGS SINCE 1970s
FOUNDED BY IIT EXPERTS
The company is founded by Prof R G Limaye, Retd, Professor, IIT Bombay, who was the pioneer of non destructive testing in India and an expert in concrete technology. His values and principles continue to guide the company in offering its professional services.
CUSTOMER TESTIMONIALS

Mamta bhusara

​Aaryan team was experienced in nondestructive testing and prompt about their offerings and timely in terms of work completion.. Helped us to finish work on time.

Priyanka Maurya

Aaryan is a well-known firm for structural audits. With a well equipped NDT lab. Testing and structural audit experience was really good.

Prateek Jaswant

We had to do Structural Audits of our building as per government and municipal corporation rules. We got our job done from Aaryan Structcon Pvt Ltd and are very happy with the way they work. Very transparent, clear and fast. I recommend their services
FROM SITE SURVEY TO REMEDIAL MEASURES - A SIMPLE PROCESS
SIMPLE 4 STEP PROCESS
Aaryan has a thorough process to ensure zero risk.
SITE SURVEY
A detailed site survey is conducted to mark the areas, wet areas, take renovation history and plan for detailed inspection.
DETAILED INSPECTION
A deatiled inspection is carried out with testing like mositure meter, pull out tests, infra red camera tests.
ROOT CAUSE
REMEDIAL MEASURES
Determination of current status and the root cause of issues and foreseen problems is tabulated.
Remedial measures are specified to mitigate the future risks and resolve the current issues.
TIMELY AND REGULAR FALSE CEILING AUDITS
MITIGATE THE RISK OF CRIMINAL AND FINANCIAL LIABILITIES.
SUCCESS STORIES
BUILDINGS, OFFICES, SOCIETIES, APARTMENTS & MORE...
Hundreds of buildngs are assesed by Aaryan every year all over India.

10,000+ STRUCTURES
ASSESSED IN 15 YEARS
TOP REASONS FOR CEILING AUDIT
​SUITABLE FOR ALL Apartments, Societies, Commercial and Industrial Buildings

.jpg)

ASSESSMENT OF CURRENT SYSTEMS
​NON- DESTRUCTIVE TESTING
REPORT WITH ROOT CAUSE AND REMEDIAL MEASURES.
Structural drawings, waterproofing areas, affected areas etc are marked and assessed for the serverity of damage
State-of-the-art instruments are used to identify supporting members, to ensure that the members have the capacity to carry the load and are anchored properly. The extent of corrosion if any, of the members is also noted.
Aaryan methodology for assessment is proven and detailed, complying to relevant standards. An exhaustive report follows, with root cause analysis and remedial measures
_edited.jpg)

.png)
PERIODIC INSPECTION DURING IMPLEMENTATION
TESTING POST IMPLMENTATION
COMPLIANCE CERTIFICATE
Periodic supervision visits matching crucial milestones of the project ensures risk-free execution of false ceiling installations.
Ensure implementation is completed as per the original plan approved
Compliance certificate Issued for the project post rectification, rectification and compliance

100%
peace of mind with
“Aaryan Safe Building System”
TAKE A QUICK 5 POINT SURVEY:
Are you facing any of these issues in your buildings?
Even if one of the above is ticked,
Aaryan False Ceiling Audit is mandatory in your building.
TAKE ACTION NOW!
Be proActive. Be Effective
PROVEN TECHNOLOGY
AUTOMATION, STANDARDIZATION, MONITORING
Aaryan has low lead times to start assignments quickly with online project planned and execution.
ONLINE SYSTEM
- Online data capture
- SOP and process compliance
- Live project progress track
PERSONAL ATTENTION
- Dedicated account manager
- Visits by qualified Engineer
REPORT
- Test report
- Condition survey report
- Preventative maintenance steps
- Certificate from lic. Engineer
ZERO RISK. ZERO HEADACHE..​
ADVANTAGES
0
Risk
Eliminate legal & criminal risk to the occuptants by Aaryan compliance report.
0
A false ceiling collapse demoralizes the team and takes their mind away from productive work. This is a headache to the management. Aaryan helps you eliminate the headache.
Headache
-
How soon can you deploy the team at site?The Initial site visit is done in a few days. Thereafter, Our usual mobilization time is a week for site work, post confirmation of order.
-
How much time does it take to complete the assignments?Typical assignments take a few weeks to complete. The actual scope and timelines depend on many factors.
-
Do you also provide a remedial scheme?We provide the remedial scheme and boq based on scope of work, which covers quantity and rates so that they are reasonable and in line with good engineering practices. This is usually done by consultants appointed by clients and is not a part of scope of testing assignments.
-
What are the costs of doing an assignment?The costs depend on the objective and scope of the assignment, including the area to be investigated. It is always better to conduct a site visit first to observe the condition and available documentation and then decide the scope.
-
Do you offer this service, pan India?Our team works across India and can be mobilized at short notice.
-
Do you also conduct audits for new construction also?We work across old and new construction, across types of structures like buildings, factories, flyovers, jetties, power plants etc. Having steel, masonry, or RCC structures.
AUDIT TOOLKIT
A TYPICAL TOOLKIT INCLUDES THE FOLLOWING
-
Endoscope with flexible camera head
-
Thermal camera
-
Laser distance meter
-
Acoustic Light hammer tapping
-
Pullout tester for ceiling fasteners
-
Torque tester for nut bolt fasteners.
SITE REQUIREMENTS
SAFE ACCESS TO THE SITE
WITH SCAFFOLDING
INSPECTION AREAS MARKED ON LAYOUT
HOUSE KEEPING SUPPORT
Safe access to the site with approved scaffolding or ladders or scissor lifts is required to reach the high and hard to reach locations.
The area to be inspected to be marked on the layout drawing. This identifies the total false ceiling area, type of false ceiling and area considered for audit
Removal of fixtures and panels, debris clearing if any, requires support from the local housekeeping and maintenance teams.
IN HOUSE R&D AND DEVELOPMENT SETUP
EXTENSIVE RANGE OF CONCRETE AND WATERPROOFING TESTING EQUIPMENT
With over 30 types of tests done on concrete and waterproofing, you are sure of the condition pre and post execution of repairs.

Thermal Imaging

Ultrasonic Testing
PLANS TO SUIT EVERY REQUIREMENT
A PLAN TO SUIT EVERY BUDGET
We have models to suit every budget and every size.
PROFESSIONAL
ENTERPRISE
ADVANCED
- Inspection and testing based on thermal imaging over a larger area.
- Inspection on sampling basis with a few locations tested by removing panels
- Extensive inspection and testing based on thermal imaging and endoscopy.
JOIN THE MISSION
THE PURPOSE OF LIFE IS TO CREATE EXTRAORDINARY EXPERIENCE FOR A LIFETIME.
_edited.jpg)
MISSION ONE MILLION
Our mission is to create a million safe and healthy living areas and workspaces for our global clients across industry segments by providing state of the art audit, testing, supervision and certification services.